Problem: Buyers needed a mold inspection before close of escrow.
Approach: Coastal conducted a full visual assessment, moisture mapping, and air sampling.
Our Work
3 projects
Problem: Buyers needed a mold inspection before close of escrow.
Approach: Coastal conducted a full visual assessment, moisture mapping, and air sampling.
Problem: A Costa Mesa homeowner requested an assessment after water damage.
Approach: Coastal checked moisture conditions and evaluated the affected areas to guide next steps.
Problem: A coastal homeowner reported ongoing musty odors and humidity concerns near the pool and outdoor living areas.
Approach: Coastal used a calibrated hygrometer to measure humidity and temperature throughout the property. Readings confirmed high humidity consistent with coastal exposure.
4 projects
Problem: A supply line leak under the kitchen sink went unnoticed. Mold grew on the cabinet base and nearby drywall.
Approach: Coastal isolated the affected area and removed all contaminated materials. They restored the kitchen to its pre-loss condition.
Problem: A homeowner discovered mold growth beneath a window seat after noticing discoloration and musty odors.
Approach: Coastal removed the affected wood framing and substrate, treated the surrounding structure, and restored the area.
Outcome: Post-remediation clearance testing confirmed the cleanup.
Problem: Elevated humidity in an unventilated crawl space produced widespread mold growth on floor joists and subfloor.
Approach: Coastal treated all affected structural members and improved ventilation. Result: A post-remediation clearance report was provided.
Problem: Moisture intrusion in a residential bathroom created conditions for mold growth behind the vanity and along the base of the walls.
Approach: A Coastal technician established full containment with poly sheeting and barrier tape before remediation began, protecting adjacent living areas from cross-contamination.
Result: Containment passed pre-clearance inspection and remediation proceeded on schedule.
2 projects
Problem: Renovation plans required removal of original popcorn ceilings confirmed to contain asbestos.
Approach: Coastal obtained all required permits, established full containment, and completed abatement.
Result: The team provided the environmental clearance documentation.
Problem: Asbestos-containing floor tiles and mastic were discovered during a kitchen remodel.
Approach: Coastal coordinated with the general contractor to safely remove and dispose of all ACM with minimal disruption to the project timeline.
Result: The remodel proceeded without delay and all abatement documentation was provided to the owner.
3 projects
Problem: Mold remediation in a master bathroom and adjacent bedroom left areas requiring full reconstruction.
Approach: Coastal rebuilt the affected areas including new drywall, insulation, paint, and finish work.
Result: The team restored the home to move-in condition.
Approach: Coastal completed a full interior remodel including new flooring, drywall, paint, and finish carpentry.
Result: The team delivered the project on schedule.
Approach: Full interior remodel featuring an updated living room, fresh paint, and refined finish work throughout.
Result: The homeowner received a refreshed, move-in ready living space completed on time and within budget.
3 projects
Problem: A soda-machine leak caused moisture to migrate beneath the flooring at Segerstrom Center for the Arts.
Approach: Coastal used Top-Down Drying to dry the affected materials in place.
Result: The affected area reached target moisture levels in four days, with the flooring retained.
Problem: Water damage at an Orange County preschool involved asbestos-containing materials, making conventional demolition and drying far more complicated.
Approach: Coastal used Top-Down Drying to dry the structure in place without disturbing those materials.
Result: The preschool reopened in 3 days instead of 3 weeks.
Problem: A slab leak caused moisture to wick up through reclaimed hardwood flooring — 100-year-old reclaimed wood imported from Australia.
Approach: Coastal used Top-Down Drying to dry the affected materials in place.
Result: We preserved the original reclaimed wood without tear-out.