Case Study — Top-Down Drying
Preschool Water Damage with Asbestos
Orange County, CA
The Problem
Water damage at an Orange County preschool involved asbestos-containing materials throughout the affected structure. The extent of moisture intrusion raised the possibility of a full demolition and abatement process, which was estimated to require approximately three weeks.
The alternative approach considered for this project would have required removing affected materials, disturbing asbestos-containing components and requiring abatement before reconstruction.
Our Approach
Coastal deployed Top-Down Drying to dry the structure in place without disturbing the asbestos-containing components. By introducing controlled heat and airflow from above, moisture was driven out of the building materials without any demolition.
On suitable projects, drying materials in place may reduce demolition. Coastal evaluates material condition, contamination, and project requirements before recommending an approach.
The Result
The preschool reopened in three days. The alternative demolition, abatement, and reconstruction approach was estimated to require approximately three weeks.
- Structure dried in place — no demolition required
- Asbestos-containing materials left undisturbed
- Demolition and abatement not required on this project
- School reopened in 3 days vs. an estimated 3+ weeks
Service used: Top-Down Structural Drying
Project Details
- Location
- Orange County, CA
- Service
- Top-Down Structural Drying
- Timeline
- 3 days
Facing water damage with hazardous materials?
On suitable projects, drying materials in place may reduce demolition. Coastal evaluates each project before recommending an approach.